PRICING GUIDE · SINGAPORE · UPDATED JUNE 2025

What a Fair Renovation Quote Actually Looks Like

Price alone tells you almost nothing about value. This guide covers real cost ranges for every major renovation trade in Singapore — and gives you the 10 criteria to evaluate whether any quote you've received is fair, before you sign a single thing.

ALUMINIUM 4G CABINET

$250–$450

per foot run

▲ 8% YTD

ALUMINIUM 5G CABINET

$380–$600+

per foot run

▲ 5% YTD

HMR PLYWOOD CABINET

$150–$280

per foot run

— Stable

VINYL PLANK FLOORING

$3–$9

per sq ft installed

— Stable

BATHROOM TILING

$8–$18

per sq ft laid

— Stable

ELECTRICAL (PER POINT)

$80–$180

concealed wiring

▲ 4% YTD

INTERIOR PAINTING

$0.35–$0.80

per sq ft, 2 coats

— Stable

FALSE CEILING

$4–$10

per sq ft installed

— Stable

Singapore Renovation Price Ranges (2025)

These are the real market ranges for renovation works in Singapore as of June 2025. They reflect the actual spread between budget and premium contractors across the Singapore market. The range is wide by design — understanding what drives prices within that range is more valuable than the number itself.

HOW TO READ THESE PRICES

Cabinet pricing is per linear foot run, inclusive of carcass, door system, and basic hardware. Flooring, tiling, and ceiling are per square foot installed. Electrical is per point added. Painting is per square foot of wall area for two coats. None include hacking of existing works, debris disposal, or specialist works like waterproofing — these should always appear as separate line items in your quote.

Cabinet Works

SYSTEM
BUDGET
MID-RANGE
PREMIUM
WHAT CHANGES BETWEEN TIERS
ALUMINIUM 3G (FRAMED)
$200–$280
$280–$360
$360+
Extrusion thickness, powder coat quality, hardware brand
ALUMINIUM 4G (CONCEALED FRAME)
$250–$320
$320–$430
$430–$600
Panel finish type, hardware (Hettich/Häfele vs generic)
ALUMINIUM 5G (HANDLELESS)
$380–$460
$460–$560
$560–$750+
Channel system quality, door thickness, full soft-close
HMR PLYWOOD (LAMINATE)
$120–$180
$180–$240
$240–$320
Board grade (E0 vs E1), laminate brand, edge banding
PVC / WPC BOARD
$80–$120
$120–$160
$160–$220
Board thickness, finish quality, hardware included

THE HYBRID BAIT — MOST COMMON CONFUSION

Many contractors quote “aluminium cabinets” but deliver aluminium door panels on a plywood carcass. This is cheaper and legitimate in dry rooms — but it is not the full moisture and termite protection of a proper aluminium build. Always ask: “Is the carcass also aluminium?” This one question should be in every cabinet quotation discussion you have.

Flooring, Tiling, Electrical, Painting & Ceiling

TRADE & ITEM
PRICE RANGE
UNIT
KEY VARIABLE
VINYL PLANK (SPC/LVT)
$3.00–$9.00
per sq ft installed
Thickness (4mm vs 8mm) and wear layer grade
ENGINEERED TIMBER FLOORING
$7.00–$18.00
per sq ft installed
Wood species, veneer thickness, installation method
BATHROOM FLOOR TILING
$8.00–$18.00
per sq ft laid
Tile brand, waterproofing membrane included
BATHROOM WALL TILING
$7.00–$15.00
per sq ft laid
Full-height vs half-height; grout type
KITCHEN SPLASHBACK
$6.00–$14.00
per sq ft laid
Tile type and pattern complexity
ADDITIONAL POWER POINT (CONCEALED)
$120–$200
per point
Wall chasing vs surface trunking
LIGHTING POINT (NEW CIRCUIT)
$120–$250
per point
Cove lighting, downlights; circuit scope
DB UPGRADE
$600–$1,800
per job
Must be EMA-licensed contractor; scope varies
INTERIOR PAINTING (2 COATS)
$0.35–$0.80
per sq ft of wall
Paint brand, surface preparation, coats included
FULL 4-ROOM HDB PAINTING
$1,200–$2,800
per project
Wall condition, coats, anti-mould add-on
FALSE CEILING (FLAT)
$4.00–$7.00
per sq ft
Standard two-level flat; framing and boarding
COVE CEILING (WITH LIGHTING TROUGH)
$6.00–$12.00
per sq ft
LED trunking and cove profile; electrical point separate

ELECTRICAL LICENSING — NON-NEGOTIABLE

All electrical works in Singapore must be carried out by an EMA (Energy Market Authority) licensed electrical worker. Unlicensed electrical work is illegal, voids your home insurance, and cannot pass SP Group inspection. Always ask for the contractor’s EMA licence number and verify it at mylicence.ema.gov.sg before work begins.

What Actually Drives the Price

Two contractors can quote very different numbers for what appears to be the same job. The gap is almost never explained by contractor greed — it is almost always explained by one of these five variables. Understanding them lets you decode any quote and compare two quotes on equal footing.

VARIABLE
LOWER PRICE SIGNALS
HIGHER PRICE SIGNALS
HOW TO VERIFY
MATERIAL SPECIFICATION
Generic or unspecified brand, thinner gauge
Named brand, specified thickness and grade
Ask for a spec sheet — brand, model, thickness in writing
HARDWARE BRAND
Generic or unbranded hinges and runners
Hettich, Häfele, Blum — longer tested lifespan
Hardware brand must be in the quote by name
INSTALLATION TEAM
Subcontracted — contractor less directly accountable
In-house team — contractor directly accountable
Ask: "Is your installation team in-house or subcontracted?"
SCOPE DEFINITION
Lump sum hides inclusions and exclusions
Itemised quote with explicit exclusions listed
Always ask for a line-item breakdown before signing
SURFACE PREPARATION
Minimal prep; new material on poor substrate
Full preparation included — hacking, levelling, priming
Ask: "What surface preparation is included in this quote?"

"The cheapest quote is rarely the best value. The best value is the contractor whose promise and delivery are closest — two years after installation."

The 10 Criteria for Evaluating Any Contractor

Use this framework to evaluate any contractor you are considering — regardless of trade. Go through each criterion, score your contractor honestly from 1 to 5, then total up the score and compare it against the guide below. A contractor who scores well across all 10 is one worth working with. One who scores poorly on the high-weight criteria is one worth replacing before you’ve committed.

HOW TO USE THIS FRAMEWORK

For each criterion below, assign your contractor a score from 1 (poor — vague or deflected the question) to 5 (excellent — clear, specific, committed in writing). The weight of each criterion reflects how much it affects your long-term outcome. Multiply each score by its weight, add up the total, and divide by the maximum possible score to get a percentage. Then apply the scoring guide below to interpret your result.

01

Material Specification

Does your contractor specify the exact material brand, grade, and thickness — or just a generic material name like “aluminium” or “plywood”? Vague material descriptions are where substitutions happen.

Ask: Can you provide a full spec sheet — brand name, model, and panel thickness in writing?

02

Full Material vs Hybrid Build

For cabinet works: is the carcass (structural box) also aluminium, or just the door panels? For other trades: is the specified material used throughout, or only in visible areas?

Ask: Is the carcass structure also aluminium? Or is this aluminium doors on a plywood or particle board carcass?

03

Pricing Transparency

Is the quote itemised — each component listed with its own price — or is it a single lump sum? A lump sum makes it impossible to verify what you are paying for or to compare contractors fairly.

Ask: Can you break this down by component — carcass, door system, hardware, and installation separately?

04

Warranty — What It Actually Covers

A “15-year warranty” that covers only hardware (hinges, runners, handles) is very different from one covering the structural carcass and workmanship. Read the actual warranty document, not the sales pitch.

Ask: Does your warranty cover the structural carcass and workmanship, or only components and hardware?

05

Portfolio & Relevant Past Work

Showroom samples show what is possible. Completed installations show what this specific contractor actually delivers. Ask to see projects similar to your property type — HDB, condo, landed, or commercial.

Ask: Can you show me completed projects similar to mine? Is a site visit to a completed installation possible?

06

Installation Lead Time — Committed

Fabrication adds weeks to a cabinet project. For other trades, mobilisation and material lead times add days. A contractor who cannot commit to a timeline is one whose schedule you will not control.

Ask: What is your current lead time from deposit to installation start? Can that be committed in writing?

07

Licensing & Regulatory Compliance

For electrical works: EMA licence is legally required. For structural works: BCA approval may apply. For HDB works: HDB renovation permit applies. A contractor who dismisses these requirements is creating liability for you, not them.

Ask: Can you provide your EMA licence number? Which of the works in this scope require HDB or BCA approval?

08

After-Sales Service Process

Problems rarely show up on installation day — they appear 3 to 6 months later. How a contractor handles post-installation issues is one of the most reliable signals of their professionalism. “We’ll sort it out” is not a process.

Ask: If I need rectification 6 months after installation, what is your response process and how quickly will you attend?

09

Verified Reviews & Reputation

Cross-reference Google reviews, Facebook feedback, and HardwareZone renovation forum threads. Weight recent reviews more heavily than older ones. Reviews that are uniformly positive and use identical phrasing are often incentivised.

Ask: Search the contractor’s business name on Google Maps, Facebook, and hwz.sg forums before your meeting.

10

Physical Samples or Completed Work Viewable

You should never commit to a finish based on a screen photograph. A contractor who can show you physical samples or invite you to a completed installation is more confident in their work and more accountable than one who cannot.

Ask: Can I see physical samples of the finish I’m choosing, or visit a recently completed installation before I commit?

How to Interpret Your Score

Score each criterion 1–5 · Multiply by weight · Total ÷ 115 × 100 = your percentage

0–40%

HIGH RISK

Do not proceed. Return with the specific questions from this framework. If answers remain vague, find a different contractor.

40–55%

CAUTION

Several gaps. Push for written answers on the high-weight criteria before signing anything. Getting a second quote is strongly advised.

55–70%

PROCEED CAREFULLY

Reasonable but not strong. Ensure all verbal commitments are in writing before signing. Identify which gaps remain and address them explicitly.

70–85%

GOOD STANDING

Contractor scores well. Confirm the remaining gaps in your contract and proceed with appropriate confidence.

85–100%

PROCEED WITH CONFIDENCE

Strong evaluation across all criteria. Ensure everything is documented in your signed contract. A contractor who scores here is worth keeping for future works.

How to Read a Renovation Quote

A renovation quote in Singapore should be a written document — not a WhatsApp number. Here is what a properly structured quote includes across every trade. If yours is missing any of these, ask for it explicitly before signing.

Material brand and specification — not just the material type, but the brand, model or grade, and relevant measurement (thickness, rating, finish type)

Component and hardware brands named — cabinet hinges and runners; electrical breaker brand; grout brand and type for tiling

Quantities stated explicitly — linear footage for cabinets; square footage for flooring, tiling, painting, ceiling; number of points for electrical. A quote with no quantities cannot be verified or compared

Installation explicitly included — some contractors quote supply-only; confirm that installation labour is included and who carries it out

Exclusions listed clearly — hacking, debris disposal, site protection, waterproofing, and structural works should each be confirmed as in-scope or explicitly excluded

Payment schedule with milestones — deposit amount (standard: 10–30%), progress payment trigger points, and final balance terms on completion

Warranty terms in writing — duration, exactly what is covered (structure vs hardware vs workmanship), and the claims process

Timeline committed in the contract — fabrication lead time (if applicable), installation start date, and estimated completion date

THE SIMPLEST COMPARISON TEST

Before comparing two quotes side by side, verify that both specify the same material grade, hardware brand, and scope. Two quotes for “kitchen cabinets” can include entirely different things. If one contractor refuses to itemise their quote to the same level of detail as a competitor, that refusal is itself data about how they will behave after you’ve signed and paid a deposit.

Tell us your needs and we'll recommend a suitable cabinet contractor.

Red Flags — When to Walk Away

These patterns appear consistently in renovation disputes and CASE Singapore complaints. Each one warrants a harder question before you proceed. Satisfactory answers are possible — but a contractor who cannot provide them is showing you how they will operate after you’ve signed.

!

Lump-sum quote that won't be itemised on request

This is the single most reliable predictor of post-renovation disputes. If a contractor declines to itemise when explicitly asked, you have no way to verify what you are paying for, no fair basis for comparison, and no paper trail if materials are substituted after signing. This is a structural accountability problem, not a minor preference.

!

Deposit above 50% required before work begins

Standard industry deposit in Singapore is 10–30% upon contract signing. Deposits above 50% upfront are a consistent pattern in renovation fraud cases reported to CASE. A legitimate contractor with a workshop, staff, and supplier accounts does not need the majority of your money before a single material has been ordered.

!

Warranty exists only verbally — nothing in the signed contract

A verbal warranty is not a warranty. “I guarantee my work” is a sentiment that cannot be enforced. Warranty terms must be in the contract: coverage period, what is and is not covered, and the procedure to make a claim. Without this, you have no recourse when something fails 18 months later.

!

Artificial urgency — "this price is only valid today"

Legitimate contractors do not lose their pricing or availability between your meeting on Tuesday and your decision on Friday. Artificial urgency is a closing technique, not a reflection of genuine supply constraints. A contractor who pressures you to sign before you have time to compare is one who does not want you to compare.

!

Price dramatically below all other quotes

Material costs in Singapore are relatively standardised. A quote 40%+ below the others almost always means something is being substituted — thinner material, generic hardware, subcontracted labour, or scope that excludes things you’ve assumed are included. The right response is not to take it gratefully, but to ask specifically what is different in the scope.

!

No verifiable reviews and no completed portfolio

A contractor operating in Singapore for more than 18 months will have a Google listing, a Facebook page, or verifiable homeowner references somewhere. Zero online presence combined with pricing that seems attractive is a high-risk combination. Do a basic search before your first meeting, not after you’ve handed over a deposit.

HDB 3-room (resale)

Kitchen · 2 bathrooms · 2 bedrooms · living area

0–40%

HIGH RISK

Do not proceed. Return with the specific questions from this framework. If answers remain vague, find a different contractor.

40–55%

CAUTION

Several gaps. Push for written answers on the high-weight criteria before signing anything. Getting a second quote is strongly advised.

55–70%

PROCEED CAREFULLY

Reasonable but not strong. Ensure all verbal commitments are in writing before signing. Identify which gaps remain and address them explicitly.

Full-Home Renovation Budget Guide

Indicative total renovation budgets combining all major trades — cabinets, flooring, tiling, electrical, painting, and ceiling — by property type. Build in a 10–15% contingency on top of whichever range you land in.

HDB 3-room (resale)

Kitchen · 2 bathrooms · 2 bedrooms · living area

BUDGET

$20K–$35K

MID-RANGE

$35K–$60K

PREMIUM

$60K–$90K

HDB 4-room (resale)

Full home · 3 bedrooms · kitchen · 2 bathrooms

BUDGET

$28K–$48K

MID-RANGE

$48K–$80K

PREMIUM

$80K–$120K

BTO 4-room (new flat)

New flat from bare — lower hacking, full fit-out

BUDGET

$18K–$32K

MID-RANGE

$32K–$55K

PREMIUM

$55K–$90K

HDB 5-room / Executive Apartment

Full home · study · utility · multiple bathrooms

BUDGET

$35K–$58K

MID-RANGE

$58K–$95K

PREMIUM

$95K–$150K

Condo (2–3 bedroom)

MCST restrictions vary; unit size ranges widely

BUDGET

$28K–$48K

MID-RANGE

$20K–$35K

PREMIUM

$60K–$90K

HDB 4-room (resale)

Full home · 3 bedrooms · kitchen · 2 bathrooms

BUDGET

$25K–$55K

MID-RANGE

$55K–$100K

PREMIUM

$60K–$90K

EXPERT QUOTE REVIEW

Have a quote or contract? Let an expert look at it.

Upload your contractor's quote or contract — in PDF, photo, or screenshot — along with your project details. Our team will review what you've been given, flag anything that doesn't match what a fair contract should include, and reach out to discuss your options directly.

We check whether the quote is itemised or whether it’s a lump sum that hides what you’re actually paying for

We flag hybrid builds where you’re paying for full aluminium but receiving aluminium doors on a plywood carcass

We check the warranty terms — whether they cover structure and workmanship, or only hardware components

We assess whether the pricing is market-reasonable for the specified scope, material, and property type

We review the payment schedule — flag unusually large upfront deposits and milestone structures that put you at risk

If the quote has issues, we’ll recommend a contractor better suited to your needs — with no obligation on your part

This service is free. Your documents are reviewed privately and are not shared with any contractor without your explicit consent.
We respond to all submissions within 1–2 business days.
This review service is available to Singapore homeowners only.

Submit Your Quote for Review

All fields are required. Incomplete submissions cannot be reviewed. We use your details only to contact you about this review.

Your details are not shared with any contractor without your consent · We respond within 1–2 business days · Singapore homeowners only

Tell us your needs and we'll recommend the right contractor

If you haven't received a quote yet, start by telling us your project details. We'll recommend a contractor matched to your property type, scope, and budget — so the first quote you get is already from someone worth considering.